Health & Safety on Site
Practical lessons and site safety scenarios for toolbox talks and pre-start briefings.
Use these sheets alongside the project risk assessment, method statement and current manufacturer instructions. Stop work and tell the site supervisor if the planned controls are missing or conditions change.
Jump to groundworks toolbox talks
Choose a toolbox talk
Safety sheet 01 Β· Supplied incident learning
Fall from alloy tower
Lessons from a reported fall, with the original incident photograph.
The original lessons-learnt report, with its wording and incident photograph retained in the IPS colour scheme.
The original report records incident-specific learning. For current inspection requirements, follow HSE guidance and the manufacturer's instructions; a tower tag does not replace a competent inspection.
Safety sheet 02
Panel handling
Planning how to move large boards and panels on site.
Illustrative training scenario β not an actual IPS incident.
1 Background
Large boards and panels can be awkward, unstable and difficult to grip. Plan delivery, storage and movement before the task.
2 Scenario
Training example: two workers begin carrying a large panel across an obstructed route. The load blocks their view and one worker starts to lose their grip.
3 Immediate risk
Strains, trapped fingers and crushing injuries can result. Stop and lower the load safely; do not try to catch a falling panel.
4 Contributory factors
The weight and centre of gravity were not checked. The route was cluttered and the team had no agreed movement plan.
5 Key controls
Avoid hazardous manual handling where possible. Use suitable mechanical aids and bring materials close to their point of use. Assess the load, task, people and surroundings. Keep routes clear.
6 Supervisor check
Confirm the handling method, suitable equipment and clear landing area. Brief the team and agree communication. Stop if conditions change; do not rely on a fixed βsafeβ lifting weight.
Plan the move before lifting.
Safety sheet 03
Cutting masonry: silica dust
Dust exposure when cutting paving blocks, kerbs and flags.
Illustrative training scenario β not an actual IPS incident.
1 Background
Cutting paving blocks, kerbs or flags with a cut-off saw can release harmful respirable silica dust.
2 Scenario
Training example: a worker starts dry-cutting paving blocks beside an occupied walkway. Dust spreads to nearby trades.
3 Immediate risk
Fine dust can damage lungs even when the job is brief. Stop uncontrolled cutting and keep others away.
4 Contributory factors
Cuts were not planned. Dust suppression was unavailable and nearby workers were not separated from the task.
5 Key controls
Reduce cuts or use precut materials or a block splitter. Where sawing is necessary, use suitable water suppression or on-tool extraction. HSE specifies H or M class extraction and APF20 RPE for this task; tight-fitting masks need face-fit testing.
6 Supervisor check
Check controls operate correctly, the exclusion area is clear and RPE fits the wearer. Tight-fitting masks require a clean-shaven seal. Review the COSHH assessment and maintenance arrangements before restarting.
Control dust at its source.
Safety sheet 04
Vehicles and pedestrians
Keeping people safe around deliveries and moving plant.
Illustrative training scenario β not an actual IPS incident.
1 Background
Deliveries and mobile plant can put workers and visitors at risk, especially where routes change during construction.
2 Scenario
Training example: a delivery vehicle begins reversing while a worker steps into its route to pass a stack of materials.
3 Immediate risk
A person can be struck or crushed. Stop the movement and clear the area before any manoeuvre resumes.
4 Contributory factors
The walkway was blocked, the reversing area was not segregated and the visiting driver had not received clear instructions.
5 Key controls
Separate people and vehicles with suitable routes and barriers. Keep walkways clear and provide visible crossings. Avoid reversing where possible through delivery planning and one-way routes.
6 Supervisor check
Brief drivers and workers on the traffic plan. Check lighting and visibility. Use trained, authorised signallers where required by the plan. Keep pedestrians outside the manoeuvring area; high-visibility clothing alone is not separation.
Keep people out of vehicle routes.
Safety sheet 05
Excavations and trench edges
Recognising hazards in trenches and around their edges.
Illustrative training scenario β not an actual IPS incident.
1 Background
Trenches may collapse or fill with water. People, spoil and vehicles can fall in or overload an edge.
2 Scenario
Training example: after heavy rain, a worker prepares to enter a trench with damaged support and spoil stored close to the edge.
3 Immediate risk
Collapse can bury or crush a person. Keep people out, isolate the area and report the unsafe condition.
4 Contributory factors
Changed ground conditions were not reassessed. Edge loading increased and the support arrangement was not checked.
5 Key controls
Plan suitable support or battering before digging. Identify services and protect nearby structures. Provide safe access, edge barriers and controls for water. Keep plant and spoil away from edges as determined by the assessment.
6 Supervisor check
A competent person must inspect supports or battering at the start of the shift and after events affecting stability. Record required inspections. Rectify defects before work. No unplanned entry or improvised rescue into an unsafe trench.
No entry until the excavation is safe.
Safety sheet 06
Damaged electrical equipment
Spotting damaged leads and tools before use.
Illustrative training scenario β not an actual IPS incident.
1 Background
Site tools and temporary supplies face water, dust and mechanical damage. Electrical defects can cause fatal injury.
2 Scenario
Training example: a worker finds a cut extension lead taped together beside a wet work area but considers using it to finish the task.
3 Immediate risk
Electric shock, burns and fire are possible. Do not use or touch damaged parts. Keep others away and arrange safe disconnection.
4 Contributory factors
The damaged lead remained available. Checks had not identified the defect and a makeshift repair was accepted.
5 Key controls
Use suitable site equipment, preferably cordless tools or a 110V centre-tapped-to-earth supply. Check equipment and remove damaged items from service. Protect cables; do not make makeshift repairs.
6 Supervisor check
Quarantine the faulty equipment and arrange repair or replacement by a competent person. Maintain an appropriate inspection and test programme. An RCD is additional protection, not permission to use damaged equipment. Electrical work requires competent personnel.
Take damaged equipment out of use.
Safety sheet 07
Floor openings and edges
Preventing falls around stairwells, service openings and exposed edges.
Illustrative training scenario β not an actual IPS incident.
1 Background
Unprotected stairwells, service openings and floor edges create fall risks during construction and fit-out.
2 Scenario
Training example: a temporary cover is moved to pass materials through a floor opening and the area is left accessible to other trades.
3 Immediate risk
A worker may fall through the opening or be struck by falling materials below. Stop access and alert the supervisor.
4 Contributory factors
The cover was removed without a controlled method. Protection was not reinstated and other trades were not informed.
5 Key controls
Avoid exposure to the edge where possible. Provide suitable collective protection, such as secured load-appropriate covers or guardrails. Warning tape alone does not prevent a fall. Plan protection during temporary removal.
6 Supervisor check
Confirm the protection is suitable, secure and checked before access. Control work below and brief affected trades. Agree who authorises removal and reinstatement. If personal fall protection is needed, plan competent use and rescue arrangements.
Protect the opening before work continues.
New scenarios are illustrative training examples. Guidance checked against the linked HSE sources on 21 October 2026. These briefing aids do not replace a site-specific safe system of work.
Construction RAMS, COSHH & process manual
Existing HomePod and IPS reference documents. Complete project-specific details and competent review before use.
Toolbox talk 08
Slips, trips and housekeeping
Walk the route from the unloading bay to the workface.
Training example
A delivery leaves straps across a muddy walkway. The next person through is carrying a box and cannot see their feet.
What to do on site
Clear the straps into the waste bin. Tell the supervisor about the mud and agree a safe route while the surface is made good. Keep deliveries and trailing leads clear of that route.
Ask the team
Where will the next delivery go so people can still get past?
Toolbox talk 09
Lifting operations and suspended loads
Agree who controls the lift and who needs to stay clear.
Training example
A pallet is ready to lift when another trade starts using the landing area as a shortcut.
What to do on site
Tell the lift supervisor and pause the lift. Check the lift plan, keep people clear of the load route and landing area, and confirm the signalling arrangements with the lifting team before restarting.
Ask the team
Show us the exclusion zone. Who stops the lift if someone enters it?
Toolbox talk 10
Fire alarms and escape routes
Find the way out from todayβs work area.
Training example
A new partition blocks the route a gang used yesterday. A stack of plasterboard also hides the nearest exit sign.
What to do on site
Raise the obstruction with the supervisor before starting. Walk the agreed escape route, identify how to raise the alarm and point out the assembly point. Brief other trades affected by the change.
Ask the team
If the alarm sounded now, which way would you leave and where would you meet?
Toolbox talk 11
Finding suspected asbestos
Know when to stop during refurbishment or strip-out.
Training example
A fitter removing a cupboard uncovers unfamiliar board behind it. The material is missing from the information given at the briefing.
What to do on site
Stop immediately. Leave the material alone, keep others away and tell the person in charge. If it has been disturbed, follow the site asbestos emergency procedure. Leave sampling and assessment to competent people.
Ask the team
Who holds the asbestos information, and how would you warn the next trade?
Toolbox talk 12
Buried services before digging
Check what lies beneath the proposed excavation.
Training example
A drainage run moves a metre sideways after the team has marked the original route. The new strip of ground has not been checked.
What to do on site
Pause digging. Have the revised route checked against service plans and surveyed by someone competent with locating equipment. Confirm service positions using the agreed safe digging method and brief the gang before breaking ground.
Ask the team
Which part of todayβs dig has been checked, and what change would trigger a fresh check?
Toolbox talk 13
Noise and hearing protection
Include the people working beside the noisy task.
Training example
A breaker starts up in an enclosed room while electricians are fixing cable tray nearby. Both gangs are exposed.
What to do on site
Review the task with both gangs. Choose a quieter method or tool where possible, separate people from the noise and limit exposure time. Use the hearing protection specified for the remaining risk.
Ask the team
Who else can hear this task, and what could we change before it starts?
Groundworks toolbox talks
Toolbox talk 14
Trench entry and inspection
Check that the protected working area reaches the task.
Training example
The next pipe joint lies just beyond the trench box. A worker suggests stepping outside the box to make the connection.
What to do on site
Keep everyone out of the unprotected section. Tell the supervisor so the protection and safe access can be provided for the next length. A competent person must inspect the excavation at the start of the shift and after anything that could affect its stability.
Ask the team
Point out the limits of the protected area. Can we reach the next joint from inside it?
Toolbox talk 15
Lowering pipes into a drainage trench
Plan how each pipe will land on the bedding.
Training example
A pipe starts to turn as it is lowered. A pipelayer moves underneath to push the end into line.
What to do on site
Stop the lift and keep people clear of the suspended pipe and trapping points. The lift supervisor should confirm the agreed method, suitable lifting accessories, landing area and signals with the team before continuing.
Ask the team
Where will the pipelayer stand, and who gives the operator the signal to lower?
Toolbox talk 16
Drainage chambers and confined spaces
Decide how to inspect a blockage from ground level.
Training example
A drain backs up. Someone offers to climb into the manhole for a quick look.
What to do on site
Keep people out and guard the opening. Ask whether a camera or other surface method will do the job. If confined-space entry is unavoidable, it needs a safe system of work, competent people and suitable rescue arrangements in place before entry. Never climb in to attempt an unplanned rescue.
Ask the team
How can we inspect this chamber from outside, and how do we raise the alarm?
Toolbox talk 17
Lifting and laying kerbs
Plan the move from the delivery pack to the kerb bed.
Training example
The grab is on another job. The gang proposes carrying the remaining kerbs by hand to finish the run.
What to do on site
Pause and arrange a suitable mechanical lifting aid, such as a compatible kerb grab or vacuum lifter. Set the packs down close to the laying position on firm ground. Check there is space for the equipment and keep hands and feet clear as the kerb lands.
Ask the team
How will we place the last kerb where the machine has less room?
Toolbox talk 18
Working around a slewing excavator
Keep the ground crew clear of the bucket and counterweight.
Training example
A groundworker walks behind the excavator to fetch the laser staff while the operator is trimming the formation.
What to do on site
Keep pedestrians outside the operating area and use the agreed separate route. If someone needs access, stop the machine and follow the agreed isolation and communication procedure before anyone approaches.
Ask the team
Show the gang the exclusion zone and the route to the laser equipment.